Central Region Operation & Maintenance Complex

West Palm Beach, FL

Designed with the surrounding setting of Cholee Park, Song + Associates pro-vided the master planning and design of the re-use Prototype of the Southern Region Operation & Maintenance Complex for the Palm Beach County Water Utilities Department in a teaming effort with Hazen & Sawyer Consulting Engineers. This successful prototype design remained unchanged but was enhanced with the addition of the Administration and Engineering Headquarters Building. The total project size increased to over 110,000 GSF. This project serves as the main hub for the northern service area for Palm Beach County.

The complex, used as an EOC site during the two 2004 hurricanes, includes a laboratory facility for both water and wastewater testing, an administrative office building, a storage building, a warehouse with loading docks, shop buildings for carpentry, welding, pump, motor, hydrant, meter and instrument repair, mini-storage buildings, vehicle wash bays and a vehicle fueling station. In addition to parking for both employees and County vehicles, there are two laydown yards for material and equipment storage.

Site circulation was designed to strategically separate private vehicles from service vehicles while providing a secure complex. Barrel tile hip roofs with large overhangs, and raised architectural banding was used to blend with the adjacent neighborhoods’ styles. The entire campus lives in dense native landscaping and undulating berms that extend along the site’s perimeter to provide separation from the adjacent property and visually enhance the site while preserving the existing natural wetlands.