Radiology Suite

Jupiter Medical Center

This project consisted of converting an existing 810 SF medical imaging space into a state-of-the-art Medical Catheterization Lab. The 500 square-foot Procedures Room required replumbing of the med-gas piping and new electrical service to accommodate the new G.E. machine - one of only three in the state of Florida. The equipment needed to run the machine required its own separate cooling system. In addition to the Procedures Room, the 115 SF Control Room was renovated as well as the patient/doctor vestibule with a new scrub sink and flooring.