Plumosa School of the Arts K-8

Location:

Delray Beach, FL

Size:

47,000 SF

Status:

Completed 2021

Education takes place within and outside the classroom. The learning environment is the whole site and so children need to be stimulated everywhere they go. Satellite administration hub connects the core curriculum to the music and arts wing for increased security and oversight.

Music classrooms include chorus, band/orchestra, and strings classrooms. All are provided with the tools needed for an educational experience focused on music and performance. All rooms were modeled to maximize sound absorption and flow through the room, both horizontally and vertically. Acoustical performance scenarios were modeled to achieve the best possible environment for the program.

•Ideal campus organization supports the transition from Elementary to Middle School

•Site logistics offer families with students at different levels a secure and safe arrangement of a neighborhood school

•Familiar learning environment and scaled educational setting

•Strategic building placement promotes integration of common spaces while allowing separation of upper grade levels

•Additional administration space in new building enhances school security and safety

•Site arrangement allowed for occupied campus during construction